Project Management & Compliance

Permits, stakeholder alignment, QA/QC, and clean close-outs—built for zero surprises.

Overview

Control the work. De-risk the outcome.

We orchestrate complex underground and marine scopes through clear governance, early permits, disciplined schedules, and rigorous documentation—so owners, EPCs, and agencies stay aligned from NTP to handover.

Average RFI Turnaround
≤ 48 hrs
Change Orders On-Time
98%
Project manager reviewing drawings and permits on site
Governance

Permits, standards & stakeholder alignment

We align to required codes and coordinate approvals early to protect schedule.

TopicDetails
PermitsTraffic control, hot work, confined space, environmental, dive operations, right-of-way
StandardsAWWA/ASME/ASTM per asset; API (as applicable); AWS D3.6M (underwater); OSHA/USACE EM 385-1-1 (site safety)
SubmittalsITP/QA plans, shop drawings, weld procedures, HDD bore plans, CIPP cure profiles, product data & MSDS
InterfacesOwners, EPCs, utilities, municipalities, environmental agencies, third-party inspectors
ReportingWeekly progress reports, look-aheads, risk & change logs, schedule updates (Gantt)
RACI Snapshot
  • R Samvanni PM — daily coordination, permits, documentation
  • A Owner/EPC Rep — scope approval & change authority
  • C Municipality/Utility — reviews & inspections
  • I Public/Neighbors — notifications & access plans
Team governance and RACI alignment board
Schedule

Milestones that hold

We baseline realistic durations, protect critical path with float, and drive weekly variance recovery.

MilestoneTypical WindowNotes
NTP & KickoffDay 0–5Roles, risk, comms cadence set
Permits/SubmittalsWeek 1–3Parallel reviews where allowed
Procure/MobilizeWeek 2–5Long-lead tracked; site setup
Execute WorkVariesDaily JHAs, QA checkpoints
Test/CommissionLast 10%Pressure/NDT/sign-offs
Close-out/Handover+5–10 daysAs-builts & O&M issued
Cost Control

Transparent change & earned value

  • Daily production tracking & two-week look-ahead discipline
  • RFIs & change notices with quantified schedule/cost impact
  • Earned Value (EV) snapshots for objective progress
  • Forecast-at-complete updated with each approved change
Schedule and cost control dashboard
Risk & Quality

Fewer surprises, cleaner punch lists

We keep a living risk register and gate QA/QC before the next phase proceeds.

RiskMitigationOwner
Permit delaysPre-application meetings & parallel submittalsPM
Utility conflictsPotholing, CCTV, updated alignmentField Eng
Weather/tide windowsSeasonal plan, float, standby crewSuperintendent
Material lead timesEarly PO, alternates, expeditingProcurement
QA/QC Gates
  • ITP hold points: pre-pour, weld fit-up, HDD pilot/ream, CIPP cure completion
  • Verification: pressure tests, weld/NDT logs, CCTV videos, cure charts
  • Documentation: redlines to as-builts, material certs, photo logs
  • Final acceptance: punch-list closure and signed commissioning records
QA/QC documentation and inspection checklist
Deliverables

Close-out you can maintain

  • Signed permits, test results & inspection reports
  • Weld maps/NDT, HDD logs, CIPP cure records
  • As-builts (PDF/CAD) and optional GIS files
  • O&M recommendations and warranty package
Request a sample close-out
Case Study — City Arterial HDD with Multi-Agency Permits

We coordinated traffic, environmental, and utility permits across three agencies for a 900-ft HDD under a four-lane road. Early stakeholder workshops and parallel reviews protected the critical path.

  • Zero rework on submittals; 100% first-pass approvals
  • Night work & detour plan minimized public impact
  • Close-out delivered in 7 days with as-builts and test records
Permit coordination and traffic control planning
Project manager reviewing QA/QC documentation on site
Next step

Outline your scope & stakeholders

We’ll map permits, interfaces, and schedule logic—then issue a draft execution plan for review.