How we deliver

A proven, compliance-first workflow from discovery to handover—built for safety, speed, and zero-downtime results.

Overview

Disciplined. Transparent. Accountable.

Our process aligns stakeholders early, leverages trenchless-first methods, integrates diving and inspection teams, and locks in QA/QC so commissioning is predictable. Here’s how each phase works—what we do, what you’ll see, and how we keep risk down.

Kickoff & Stakeholder Mapping

Roles, goals, constraints, and communication cadence established.

Survey & Investigation

CCTV, utility locates, geotechnical review, environmental screens.

Design & Permitting

Method selection (HDD/CIPP), alignment, drawings, permits, traffic control.

Build & Commission

Execution, inspection/verification, turnover documents, and as-builts.

Phases

From concept to close-out

Six phases keep work flowing and stakeholders aligned.

01
Discovery

We clarify objectives, constraints, and interfaces across owners, EPCs, and municipal agencies.

  • Scope & risk register
  • Stakeholder matrix
  • Schedule & comms plan
02
Survey

We capture precise subsurface conditions to reduce unknowns before crews mobilize.

  • CCTV & leak checks
  • Utility locates & geotech
  • Environmental screening
03
Design

We select the safest and cleanest approach, favoring trenchless methods where feasible.

  • Method & alignment
  • HDD/CIPP calculations
  • Work packs & submittals
04
Build

Field execution with underwater welding/diving support, HDD, and CIPP crews as needed.

  • Daily JHAs & toolbox talks
  • Traffic & public safety
  • Progress tracking
05
QA/QC

Testing and documentation ensure assets perform as designed before service.

  • Pressure & integrity tests
  • Weld/NDT records
  • Inspection sign-offs
06
Handover

We deliver complete turnover packages and O&M guidance for long-term reliability.

  • As-builts & GIS files
  • Close-out submittals
  • Warranty & O&M plans
Standards

Safety, environment & compliance

Safety drives every decision. Our crews follow rigorous permits-to-work, lockout/tagout procedures, and daily JHAs. We coordinate closely with municipalities and utility owners to keep the public protected and projects compliant.

Ask about our HSE program
Work Permits

Traffic, hot work, confined space, diving—planned and documented before execution.

Testing & Verification

Pressure, leakage, CCTV videos, weld logs, and CIPP cure data stored in close-out packs.

Environmental Controls

Erosion/sediment controls, spill kits, and protection plans for waterways & habitats.

Documentation & As-builts

Traceable records and GIS deliverables to streamline future maintenance.

FAQ

Process questions, answered

Quick clarity on schedule, permits, and what to expect.

It depends on stakeholder availability and project complexity. Typical discovery takes 1–2 weeks and results in a validated scope, risk list, and a communication cadence.

We’re trenchless-first. If HDD, pipe bursting, or CIPP meet safety and compliance requirements, we use them to minimize disruption. If open-cut is required, we plan it to strict safety and environmental standards.

You receive signed test results, inspection videos/reports, weld/NDT logs, permits close-out, as-built drawings, and optional GIS files—plus warranty and O&M guidance.

Yes. Our 24/7 mobilization follows a compressed version of the same governance: safety briefings, permits, testing, and documentation—so emergency work integrates cleanly with long-term records.